13 February, 2007

Preparation for Departure


The final touches have been completed, now all that was required was to stow some equipment and remove the halyards, sheets and lines from the vessel. I understand the outside of Malua will be covered in oil and grime after the ocean transportation especially with the passage through the Panama Canal. The halyards were removed and in their place I ran a light line so they could be pulled back into their original locations. It is amazing the length of line one has on a yacht when you stack then on the deck. Most of these lines have not been removed before and now require a good wash which I will do before re-running them when Malua reaches Palma.

I changed the oil and filters on the engine, filled the diesel tank and pumped the bilges completely dry. The hatches and cockpit lockers were taped closed and the RIB and outboard stowed.

To load Malua on to the ship I will have to remove the back stays and place temporary lines to hold the mast up during the crane lift. This is always a tricky business because Malua has two heavy roller furlers forward of the mast. The side stays are abeam of the mast and any movement will push the mast forward. This happened to me on Alibi when I was on the hardstand. The crane touched the mast which fell forward, crashing over the side and bent the stantions. Thankfully on that occasion nothing major broke and the mast was not damaged but I would not like that to happen to Malua’s taller mast.

The news arrived that the Erasmusgracht was due into Sydney harbour on Thursday evening and we would be loading at 7:30 on Friday morning.

No comments: