14 October, 2006

Glassing the Plug


Yesterday, the hottest day of the spring we decided to fibreglass the plug. Vince's yacht is in his factory and the deck is right under the roof so the temperature was right up there like an oven. As a result the fibreglass went off well before time and we struggled to get it wetted out. In fact it was a debacle. The plug was covered with different thicknesses of glass, some of which were well covered in resin while the others were still dry. Thank goodness it is only a mould.

I designed the windows on the plug then set about cutting the wood to form the frames in the female mould. These will be screwed to the inside of the mould.

Vince will remove the female mould from the plug and buff the edges to form the final mould. I will then return to Newcastle to lay-up my dodger before he does the same for his dodger.

07 October, 2006

Fitting dodger plug


I took the dodger plug to Newcastle to fit it to Vince's Adams 40 which is still under construction. This gave me a change to check the measurements and to see it in situ. I think it will look good although there is still a long way to go so there is still a down side risk.
Collected the sails from Noth loft after having a snuffer fitted to the big spinaker. They repaired some wear and tear on the working sails. I am still very pleased with the choice of North sails - the value, quality and service.