13 February, 2007

Preparation for Departure


The final touches have been completed, now all that was required was to stow some equipment and remove the halyards, sheets and lines from the vessel. I understand the outside of Malua will be covered in oil and grime after the ocean transportation especially with the passage through the Panama Canal. The halyards were removed and in their place I ran a light line so they could be pulled back into their original locations. It is amazing the length of line one has on a yacht when you stack then on the deck. Most of these lines have not been removed before and now require a good wash which I will do before re-running them when Malua reaches Palma.

I changed the oil and filters on the engine, filled the diesel tank and pumped the bilges completely dry. The hatches and cockpit lockers were taped closed and the RIB and outboard stowed.

To load Malua on to the ship I will have to remove the back stays and place temporary lines to hold the mast up during the crane lift. This is always a tricky business because Malua has two heavy roller furlers forward of the mast. The side stays are abeam of the mast and any movement will push the mast forward. This happened to me on Alibi when I was on the hardstand. The crane touched the mast which fell forward, crashing over the side and bent the stantions. Thankfully on that occasion nothing major broke and the mast was not damaged but I would not like that to happen to Malua’s taller mast.

The news arrived that the Erasmusgracht was due into Sydney harbour on Thursday evening and we would be loading at 7:30 on Friday morning.

Over the Bar


The day to load Malua on the vessel was set for the later part of February but some how it came forward. Unfortunately the tide and water over the bar did not make a similar adjustment. The last high water at the bar that I could cross with safety was on 6th February thereafter I would have to wait more than ten days. This did not coincide with the loading date in Sydney of 13th February. I had to complete all the preparation tasks and cross the bar on the high tide on Saturday 5th February. This took no account of the weather for the trip to Sydney. I have always said I would not sail on a timetable but when the weather was suitable. Two days before the shipping company advised that the loading date had been brought forward to the Thursday 7th February – not much time to reach Sydney and a schedule.

Stephan joined me for the sail to Sydney and the weather forecast turned out favourable. We crossed the Batemans Bay bar on Saturday morning and headed out to sea with a forecast of southerly wind to push us to Sydney.

The wind did not come through as predicted so we spend some time motor sailing towards Jarvis Bay where we anchored for the night. We had a great pre-prepared meal and a restful sleep after the excitement and pressure of the departure.

At dawn the follow morning we set sail and the southerly rose to a convenient 10 knots. We raised the spinnaker with its new snuffer and sat back in the sun to enjoy the run north to Sydney. We arrived just as the sun set and anchored inside the north head in Quarantine Bay.

Monday saw us motor under the Sydney harbour bridge and into Blackwattle Bay next to the fish market. I then settled down to prepare Malua for its departure and wait for the instructions to load.